macOS ran everything in one job on a 3-core runner: ~93 minutes on
44024695993 (Test 65m, Race 24m), and the Test step met its 75m cap with
no test failing (#6903). The packages' own times sum to ~2250s; the rest
was waiting for a processor. Raising the cap would only be met again.
macOS now runs as four jobs: three shares of the packages but the gateway
(build/pkg-shards.sh, slowest first onto the lightest share, with macOS
CI's seconds for the slow packages), and the gateway with the race steps.
The old Test step is split into Test (packages) and Gateway; ubuntu and
Windows run whole as before. Vet runs once on macOS, in share 1/3. The
Test cap goes from 75 to 45 minutes.
Run: build/pkg-shards.sh 1..3 of 3 over `go list ./...` (124 packages):
41/42/41, each with three of the slow packages, ~870s apiece, and their
union is the list; the step's pipeline under bash -eo pipefail (bash
3.2 too) for each part; actionlint (only the Gofmt step's old SC2046).
workflow_dispatch run 44046493476 at this tree (branch ci-mac-parts),
all green: macOS 1/3 12m, 2/3 17m, 3/3 15m, gateway with race 34m
(the macOS job was ~93m); ubuntu 37m, windows 5m.