lessons: 11-14 two changes pushed before their own suite, at a coordinator's ask

Recorded from the review of 32c830fc1 and 106a24b95. Docs only; nothing run.
This commit is contained in:
yetone
2026-11-14 19:29:46 +08:00
parent 61e2035d39
commit 534b1a334e
+9
View File
@@ -1430,6 +1430,15 @@ each one.
leave by downloading by hand. When both boxes are busy, a change to
the update path waits for a full run, or takes it on the Windows or
Linux box; a full disk on a run box is cleared, not worked around.
- Pushed before its own suite finished, "at the coordinator's ask":
32c830fc1 (TUI language, +1,293 lines) and 106a24b95 (skills update
by themselves). Both suites later came back with only the known
#6648 red, and 32c830fc1's result went on #6649, a CLI feature
issue nobody reading the commit would find. A coordinator's hurry
doesn't stand in for the run: wait for it, or push and then put the
result where the commit points (its own issue, named in the body).
106a24b95 did what the updater lesson above asks: with mote at
load 167 it ran the full suite in WSL instead of skipping it.
- No Test run finished green from 63c91cae5 (11-13 21:51 UTC) to
07a62b373 (11-14 08:34 UTC): 57 runs were cancelled by the next push
and two went red (TestEffortUpdateRefused, fixed in a4937f8ff;