LESSONS: 11-14 afternoon, 14 tags with no green CI run behind them

After 1ab2c3984 only two Test runs finished, both red on the hub
pruner race (fixed in 49f49c41c); the rest were cancelled by the next
push. Docs only; nothing run.
This commit is contained in:
yetone
2026-11-15 00:17:14 +08:00
parent 3ffac60480
commit 217e933dd9
+6
View File
@@ -1454,6 +1454,12 @@ each one.
bodies name. A cancelled run tests nothing; when pushes come faster
than a run takes, someone lets one run finish, or the workflow keeps
the run of the newest tag instead of cancelling it.
It happened again the same day: after 1ab2c3984 (11:38 UTC) went
green, the only two runs to finish were red (TestInfoSaysMCPHub,
fixed in 49f49c41c). Every other run was cancelled up to 221c91fae
(16:16 UTC), and the 14 tags v0.1.4171 to v0.1.4184 had no green
run behind them. 6bdeedc6f (1,836 lines, a new keyless gateway
route) ran only its own tests and has no "Not run" line.
- A library vendored for an allocation cut: 0caa09b3d copied
yaml.v3 v3.0.1 into third_party (11,400 lines, go.mod replace) for
a 7-line emitter change. The review diffed it against the gofmt'd